SEO slump, data lake and AI-assisted advertising control
After several anti-spam updates, both organic and paid visibility collapsed — for a business model that depends on short sales phases. The answer: a central data foundation, AI-assisted analysis and a learning system for advertising control.
Starting point
A market under pressure — and monitoring that was too slow for the speed of the business.
- Visibility slump after anti-spam updates — organic and paid
- Volatile demand per event, artist and country
- Manual campaign monitoring too slow for short sales phases
- Advertising pressure weighs on the margin without signals being detected in time
Approach
Instead of tweaking symptoms, the data foundation was rebuilt — and a learning steering system was built on top of it.
Central data lake
Combining first-party data from GA4, Search Console, ERP and ads, enriched with third-party data (Google Trends, competitor prices, market status, TV schedule).
New campaign architecture
Country budgets by sales phase, campaigns at artist level, intent-based ad groups.
AI analysis per event
For every order, an enriched dossier is created and analysed with a RAG-supported prompt: price, advertising, offer, page quality.
Machine learning & momentum scoring
Every 15 minutes a momentum score from traffic, impressions, clicks, search intent and sales; a training layer (including random forest) improves the recommendations with use.
Result
The target picture: advertising control that reacts to sales signals instead of gut feeling. The system detects peaks, forecasts rising or falling demand and recommends raising, lowering, holding or stopping bids by a certain percentage. Human in the loop: recommendations are accepted manually and labelled; machine learning algorithms evaluate the results and replay scenarios. API access is read-only.
- Automated dossier for each new order with a recommended action
- Prioritised campaign recommendations: hold, raise, monitor, stop
- The system stays in the company: documented, in GitLab, ready for handover
- Interim status: structure and pipeline in place; training layer and automation being finalised
Tool
The real-time early warning system from this mandate — architecture, peak detection and adaptation offer.
Levers used
Technical and methodological tools used in this case.
Technical
Methodology
Porter's value chain — activities worked on during the mandate
A similar situation?
Every mandate starts with a short, no-obligation conversation — and an honest assessment.
Discuss your situation